Gujarat
|
|
|
---|---|---|
Policy arrangement | Open access (net metering not allowed) or captive consumption | |
Eligibility | Above 1 MW | |
Banking | Allowed on daily basis; banking charge of INR 1.50/ kWh | |
Incentives | None | |
Others | Project size limit: 50% of sanctioned load for solar and wind (100% for MSME manufacturing units) |
|
Relevant links |
|
Please provide the following details