MNRE has issued National Green Hydrogen Mission with the objective to stimulate green hydrogen production in the country.
2030 target |
Green hydrogen production of 5 MMT per annum allied with 125 GW renewable capacity with a total capital outlay of INR 8 trillion (USD 98 billion) |
Implementation |
Phase I: 2023 to 2026 - Increase domestic electrolyser manufacturing - Introduce green hydrogen to oil refining, fertiliser manufacturing and city gas sectors - Develop a robust regulatory framework |
Phase II: 2027 to 2030 - Ramp up green hydrogen penetration in oil refining, fertiliser manufacturing, and city gas sectors - Introduce green hydrogen to steel, mobility, and shipping sectors - Ramp up pilot projects to study applications in other sectors including railways and aviation |
|
Capital subsidy |
Total subsidy of INR 175 billion (USD 2.2 billion) for electrolyser manufacturing and green hydrogen production to be allocated through competitive bidding process |
Other incentives |
- Waiver of ISTS charges - Power banking facility - Streamlined open access approval process - Similar provisions as provided in solar park, manufacturing zone and SEZ schemes |
Green hydrogen purchase obligation |
Minimum share of consumption of green hydrogen or its derivatives to be specified for designated consumers |
Active
Final